Schwarz Construction is a certified EDWOSB
- 19
- May
- 2016
- Posted byKarenSchwarz
- inAll Blog Posts
- Comments Off on Schwarz Construction is a certified EDWOSB
Economically Disadvantaged Women Owned Small Business Schwarz Construction LLC is proud to be certified as an EDWOSB. Women owned small businesses have begun to play a key role in the growth of the economy. The government has recognized the need for these businesses to succeed and as such they put in place a contracting program to […]
Continue Reading...Cincinnati Metropolitan Housing Rehab
- 19
- May
- 2016
- Posted byKarenSchwarz
- inProjects
- Comments Off on Cincinnati Metropolitan Housing Rehab
Scope: Supplied all materials and labor necessary for the rehabilitation of several single family units for Cincinnati Metropolitan Housing . Project consisted of replacing all deteriorated masonry, as well as the replacements of roofs, framing, and drywall. Total Cost: $1.9 Million
Continue Reading...- Posted byKarenSchwarz
- inProjects
- Comments Off on Covington KY Airport Digester Tank Motor installation
Scope: Schwarz Construction furnished a crane and set the Digester Tank Motor mixer and all accessories. Project Total: $65,000.00
Continue Reading...- Posted byKarenSchwarz
- inProjects
- Comments Off on Great Onyx Job Corps Center Electrical and Roof Replacement Project
Scope: This project involves the replacement of the vocational storage building roof as well as numerous electrical upgrades throughout the facility including lighting, Panels, and switches. Project Total: $254,000.00
Continue Reading...Waterline Recap Project
- 11
- May
- 2016
- Posted byKarenSchwarz
- inProjects
- Comments Off on Waterline Recap Project
Scope: Replace and construct new water mains and water meters with leak detectors. Installation of a filter control system, as well as an upgrade to an existing Supervisory Control and Data Acquisition control system. We will replace 2 each 500 GPM service pumps, 1 each 250 GPM service pump and 1 each 250 GPM high […]
Continue Reading...M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Recent Contracts
- Design/ Build Water Main & Supply Recap Phase 1 = $3,999,516.05
- USFS IDIQ construction of bridges, roads, streets, and railways for US Forest Service
= $4,000,000 - Design/Build Water & Wastewater Systems Operations award = $$3,997,140
- Design/Build Membrane Filtration award = $3,998,065.28
- Design/Build Water & Wastewater Systems Operations award = $3,997,140