Waterline Recap Project

40288683_sScope: Replace and construct new water mains and water meters with leak detectors. Installation of a filter control system, as well as an upgrade to an existing Supervisory Control and Data Acquisition control system. We will replace 2 each 500 GPM service pumps, 1 each 250 GPM service pump and 1 each 250 GPM high pressure service pump and 1 each 250 GPM high service pumps to the filters and clear well as required, as well as the installation of baffles.

Project Total: $4,000,000.00