Scope: Replace and construct new water mains and water meters with leak detectors. Installation of a filter control system, as well as an upgrade to an existing Supervisory Control and Data Acquisition control system. We will replace 2 each 500 GPM service pumps, 1 each 250 GPM service pump and 1 each 250 GPM high pressure service pump and 1 each 250 GPM high service pumps to the filters and clear well as required, as well as the installation of baffles.
Project Total: $4,000,000.00
Recent Contracts
- Design/ Build Water Main & Supply Recap Phase 1 = $3,999,516.05
- USFS IDIQ construction of bridges, roads, streets, and railways for US Forest Service
= $4,000,000 - Design/Build Water & Wastewater Systems Operations award = $$3,997,140
- Design/Build Membrane Filtration award = $3,998,065.28
- Design/Build Water & Wastewater Systems Operations award = $3,997,140